Apartment Refurbishment

One of our niche areas is apartment refurbishments. Renovating apartments is hard work, with brick walls and mostly concrete floors it makes construction, demolition and service relocations very difficult. With our team of skillful trades we have perfected the whole process.

Once onsite for a quotation we will go through any ideas that you have regarding your proposed refurbishment and also run you through some of our ideas and clever designs based on our experience and speciality within the industry we know what works and what doesn’t and most importantly what looks good.

We will then measure up and provide you with a quotation within 5 business days. This wont be your standard quotation that you are used to, this will be a detailed scope of works for each specific area, from kitchen to bathrooms to flooring from start to finish throughout the entire project, this will be followed by a detailed broken down costing.

Once our quotation is approved we will provide you with a 3D kitchen design.

With apartments we can either do a fully custom made kitchen or we can also provide in most cases a modular design that can be made to look fully custom, this is normally a more cost effective option and generally a shorter lead time.

HOW LONG DOES IT TAKE?
Generally for most 2-3 bedroom apartment refurbishments start to finish we allow between
7-8 weeks.

HOW MUCH WILL IT COST TO RENOVATE MY APARTMENT?
The below amounts should be a good guide for most 2-3 bedroom apartments providing all works are carried out at the same time and have good access.
Please note: This is to be used as a guide only, all quotations will be quoted on a job specific basis.

Kitchen $22-35K
Bathroom $22-27K
Ensuite $18-22K
Roller blinds $4K
Painting $9-11K
Flooring $6-11K
General electrical and lighting throughout $5-7K

WHEN CAN WE START?
We can normally commence works within 3-4 weeks from acceptance of our quotation and after kitchen design has been approved.

DO WE GET CHAMPAGNE WHEN YOU FINISH?
You sure do!!